GENERAL PUMP (INTERPUMP GROUP) • MODEL EZ4040G

General Pump EZ4040G Triplex Plunger Pump Specs & Calibration Guide

Verified engineering standards for the Italian-manufactured General Pump EZ4040G (Interpump Group) commercial direct-drive triplex plunger pump. Rated at 4000 PSI and 4.0 GPM at 3400 RPM with forged brass manifold head, 15mm solid ceramic plungers, dual-stage V-packings, and external VRT3-310EZ pressure unloader tuning protocols.

🛒 Check General Pump EZ4040G on Amazon → ⚡ View Verified Specifications
4000 PSI Max Continuous Pressure
4.0 GPM Discharge Volume
15 mm Solid Ceramic Plungers
1" Hollow Engine Crank Bore
VERIFIED ENGINEERING SPECIFICATIONS

General Pump EZ4040G Specifications & Rebuild Kits

Dimensions, replacement seal packages, and unloader options:

Component / SpecMetric DimensionKit / Part NumberDirect Sourcing
General Pump EZ4040G4000 PSI, 4.0 GPM @ 3400 RPMEZ4040G (1" Hollow Shaft, 4-Bolt Flange)Check Price on Amazon →
VRT3-310EZ Unloader4500 PSI Max, 10.5 GPM FlowExternal Pressure-Actuated Bypass ValveView VRT3 Unloader on Amazon →
Ceramic Plungers Kit15mm Diameter Solid CeramicGP Kit #69 (3 Plungers, Spacers & Copper Washers)View Plunger Kit on Amazon →
High-Pressure Seal Kit15mm Dual V-Packing KitGP Kit #88 (High & Low Pressure Water Seals)View Seal Kit on Amazon →
BENCH SERVICE PROCEDURE

How to Calibrate a VRT3 Unloader on General Pump EZ4040G

Improper unloader adjustment ruins pump seals and cracks brass manifolds. Follow this pressure gauge calibration procedure:

STEP 1: BACK OFF UNLOADER TENSION

Loosen Black Adjustment Knob

Before starting the engine, back out the main spring tension knob on the VRT3 unloader until spring tension is completely relaxed.

STEP 2: CONNECT 5000 PSI IN-LINE GAUGE

Install Gauge Between Pump & Hose

Couple a liquid-filled 0–5000 PSI gauge to the unloader discharge port. Connect your 50 ft high-pressure hose and install a calibrated #4.0 spray nozzle in your spray wand.

STEP 3: TIGHTEN UNLOADER WHILE SPRAYING

Set Operating Pressure to 4000 PSI

Start the engine and run at 3400 RPM full throttle. Squeeze the trigger gun continuously while gradually turning the unloader knob clockwise until the pressure gauge reads 4000 PSI.

STEP 4: VERIFY BYPASS SPIKE PRESSURE

Check Pressure Spike Upon Release

Release the trigger. The pressure gauge spike should not exceed 4300–4400 PSI (maximum 10% pressure spike). Lock the locknut on the unloader shaft to secure calibration.

Check VRT3 Unloader on Amazon →
FREQUENTLY ASKED QUESTIONS

Technical & Field Service FAQs

Why does my General Pump leak water between the manifold and crankcase?

Water dripping from the weep holes beneath the brass head indicates worn high-pressure packing seals (Kit 88). If left unserviced, water will breach the oil seals (Kit 23) and contaminate the crankcase oil, ruining the bronze connecting rods.

Can I replace a cracked ceramic plunger on an EZ4040G?

Yes! General Pump uses solid ceramic cylinder sleeves that slide onto stainless steel plunger rods. Remove the brass manifold bolts, unscrew the plunger retainer bolt with a 10mm wrench, and install a new 15mm ceramic sleeve (Kit 69) with fresh copper crush washers.

What oil capacity does the General Pump EZ4040G crankcase hold?

The EZ4040G crankcase holds 14.0 oz (0.41 L) of non-detergent SAE 30W industrial pump oil. Change oil after the first 50 hours of break-in, and every 500 hours or annually thereafter.